87 Feet of Clay Pipe Needed Trenchless Pipe Rehabilitation in Saratoga Springs, NY
Saratoga Springs – NY. The homeowner had issues with the sewer line that needed to be resolved before they sold it. The 4″ clay tile pipe had numerous sections with cracks, and sections missing. There were also joints that had root intrusions as well. The line runs roughly 87′ long. The line was descaled and […]