87 Feet of Clay Pipe Needed Trenchless Pipe Rehabilitation in Saratoga Springs, NY

Reliable Trenchless Pipe Rehabilation

Saratoga Springs – NY. The homeowner had issues with the sewer line that needed to be resolved before they sold it. The 4″ clay tile pipe had numerous sections with cracks, and sections missing. There were also joints that had root intrusions as well. The line runs roughly 87′ long. The line was descaled and hydro jetted to ensure there was no debris left. After the liner was installed, the line was camera inspected to ensure it was properly adhering to the walls of the pipe. The crew used 4′ scrim liner for the cast iron-clay sewer line. The job took roughly one day to complete, including mobilization, set up, prep, lining, and break down.